- Decontamination from the outside
- Calibration test of 3 volumes, 10 measurements per volume in the 'as left' condition
- Preventive maintenance – internal & external cleaning, leak testing, lubricating of internal parts if applicable, and repair (parts replacements at an additional cost). Adjustment, if applicable
- Issuing of service report, calibration certificate and calibration label in compliance with ISO/IEC 17025 regulations
- Please note: the next service due date will default to 12 months cycle unless otherwise specified/requested.
SE | SEK
SE | SEK
-
- Benchtop Centrifuges
- Floor-Standing Centrifuges
- Refrigerated Centrifuges
- Microcentrifuges
- Multipurpose Centrifuges
- High-Speed Centrifuges
- Ultracentrifuges
- Concentrator
- High-Speed and Ultracentrifugation Consumables
- Accessories
- Tubes
- Plates
- Device Management Software
- Sample and Information Management
- IVD Products
ISO 17025 including Preventive Maintenance – 12 channels
Product Information
12-channel, pipette maintenance and calibration serviceYou will find additional download material at the bottom of this page
Features